Saturday, May 17, 2025

TCN announces routine maintenance in parts of FCT

Must read

Ibrahim Ramalan
Ibrahim Ramalan
Ibrahim Ramalan is a graduate of Mass Communications from the Ahmadu Bello University (ABU) Zaria. With nearly a decade-long, active journalism practice, Mr Ramalan has been able to rise from a cub reporter to the exalted position of an editor; first as Arts Editor with the Blueprint Newspapers before resigning in 2019; second and presently as an Associate Editor of the Daily Nigerian online newspaper. He can be reached via ibroramalan@gmail.com, or www.facebook.com/ibrahim.ramalana, or @McRamalan on Twitter.
- Advertisement -
tiamin rice
tiamin rice

The Transmission Company of Nigeria, TCN, has announced plans to ccarryout maintenance on the 60 Mega Volt Ampree, MVA, TR2 at Kukwaba Transmission substation in the Federal Capital Territory, FCT.

The company’s General Manager Public Affairs, Ndidi Mbah, made this known in a statement in Abuja on Saturday, posted on the company’s verified twitter handle.

Mbah said that the maintenance will take effect on Saturday from 9 am until 4 pm.

tiamin rice

The statement reads:

whatsApp

”TCN wishes to inform the public that its maintenance team will be conducting routine preventive maintenance on the 60MVA TR2 at Kukwaba Transmission Substation on Saturday from 9 am to 4 pm.

”As a result, the Abuja Electricity Distribution Company(AEDC) will be temporarily unable to draw power from the transformer to supply electricity to Wuye, Utako, parts of Jabi.

”Idu Railway station, EFCC, FMC, Baze University, Nile University, Coca-Cola, Citec, Idu Industrial Area, Kuchigoro, and Karomajiji for approximately seven hours,”she said.

According to the TCN, power supply will be restored upon completion of the maintenance work.
NAN

- Advertisement -

More articles

- Advertisement -

Latest article

- Advertisement -