Tuesday, May 6, 2025

FAAN closes Lagos airport runway for rehabilitation

Must read

Ibrahim Ramalan
Ibrahim Ramalan
Ibrahim Ramalan is a graduate of Mass Communications from the Ahmadu Bello University (ABU) Zaria. With nearly a decade-long, active journalism practice, Mr Ramalan has been able to rise from a cub reporter to the exalted position of an editor; first as Arts Editor with the Blueprint Newspapers before resigning in 2019; second and presently as an Associate Editor of the Daily Nigerian online newspaper. He can be reached via ibroramalan@gmail.com, or www.facebook.com/ibrahim.ramalana, or @McRamalan on Twitter.
- Advertisement -
tiamin rice
tiamin rice

The Federal Airports Authority of Nigeria, FAAN, has  closed  Runway 18R/36L at the Murtala Muhammed Airport, Ikeja  for rehabilitation.

The closure started from 3.00 a.m. on Monday. It will end at 11.59 p.m. on Tuesday.

This is contained in a statement signed by the Director, Public Affairs and Consumer Protection, FAAN, Obiageli Orah.

tiamin rice

According to Orah, the closure is due to ongoing rehabilitation work (asphalt phase) at the A2 Taxiwaylink of the runway.

whatsApp

She said that it was  part of ongoing efforts to ensure that the runway would remain in optimal condition.

“There will be no disruption to flight operations during this period as all flights would be redirected to the alternative runway, 18L/36R,” she said.

She emphasised FAAN’s committment to the safety, security and comfort of airport users.

NAN

- Advertisement -

More articles

- Advertisement -

Latest article

- Advertisement -