Sunday, May 4, 2025

Part of Lagos-Ibadan expressway to be closed on Monday – FRSC

Must read

Ibrahim Sha’aban
Ibrahim Sha’aban
Ibrahim Ramalan is a graduate of Mass Communications from the Ahmadu Bello University (ABU) Zaria. With nearly a decade-long, active journalism practice, Mr Ramalan has been able to rise from a cub reporter to the exalted position of an editor; first as Arts Editor with the Blueprint Newspapers before resigning in 2019; second and presently as an Associate Editor of the Daily Nigerian online newspaper. He can be reached via ibroramalan@gmail.com, or www.facebook.com/ibrahim.ramalana, or @McRamalan on Twitter.
- Advertisement -
tiamin rice
tiamin rice

The Federal Road Safety Corps, FRSC, on Friday said that Julius Berger construction company has notified them of its intention to extend the reconstruction work from Magboro to Punch section of the Lagos-Ibadan Expressway from October 21 to January 31, 2020.

Speaking with newsmen, the Ogun Sector Commander of FRSC, Clement Oladele, said the rehabilitation work will cause a temporary diversion of the Lagos bound traffic to the Sagamu bound carriageway from Magboro to Punch.

According to him, the closure became necessary to enable the company begin rehabilitation work on the 1.3 kilometers stretch of the expressway.

tiamin rice

“This temporary diversion of traffic will transfer the Lagos inbound traffic to the same carriageway conveying traffic outward Lagos.

READ ALSO:   FRSC to go after trucks ferrying passengers

READ ALSO: 6 die, 24 injured in auto crash on Lagos-Ibadan expressway

“This will therefore make both the traffic inward and outward Lagos accommodated on the same section of the expressway within the 1.3 kilometers stretch of the road from Magboro to Punch in Ogun State.” he said.

NAN reports that there was partial closure of the Lagos end of the expressway from September 2 for the ongoing reconstruction work on the 600-metres stretch between Ojodu Berger and the beginning of Kara Bridge.

whatsApp

The sector commander advised motorists to take note of the development and plan their trips by allowing more time to their traveling time.

READ ALSO:   NCC to unveil strategic plan for telecom sector in January  

This he said is in view of the construction work that would narrow the carriageway which may impair traffic.

“Motorists are also enjoined to observe lane discipline and avoid driving against traffic, as violators risk impoundment of their vehicles and liable to payment of N50,000 naira traffic fine,” he said.

The FRSC boss cautioned motorists to drive within the maximum speed limit of 50km per hour, the maximum speed at construction zones as prescribed by the National Road Traffic Regulations, 2012, to avoid road crashes.

Mr Oladele, however, commended the public for their patience and cooperation, adding that they still have to bear with the inconvenience the temporary diversion might cause.

READ ALSO:   Why we held simulated terror attack on Abuja stadium – NEMA

He also implored motorists to continue to cooperate with the FRSC and other traffic and emergency agencies that would be strategically deployed to control the diverted traffic around the rehabilitation sections.

The sector commander said that motorists observing traffic emergencies could contact the FRSC toll-free number 122.

NAN

- Advertisement -

More articles

- Advertisement -

Latest article

- Advertisement -